Installation SGE Heat Pump สายพันธ์ไทย@Beyond Resort Krabi : Thailand

Siam Green Engineer Co.,Ltd. install SGE heat pump at Beyond Resort Krabi : Thailand with model 25kW 2 units

instead of electric heater more 70 kW with 170 room service use SGE heat pump only 12kW per hour    This project is one of Kata Group which use SGE Heat Pump Thai Brand .

 

DSCN3322

 

Energy Saving Cost calculation :

Heat Pump : 6 kW / unit x 2 x 12 run time x 4 Baht /unit = 576Baht/day = 17,280Baht/month =207,360Baht /year.

Electric Heater: 70 kW x 6run time  x 4 Baht             =      1,680Baht/day =50,400Baht/month =604,800Baht/year.

So can save much as 397,440 Baht per year and 2.5 year pay back period.

Share VDO SGE heat pump install work and piping in system with the controller.

DSCN3323

SGE Heat Pump picture install at Beyond Kribi.

VDO SGE Heat Pump. How to installation and control system in control room.

DSCN3324

SPOTLIGHT : ” Energy Saving Cost calculation ” with  ” Leafs ” Thailand Brand by Siam Green Engineer Co.,Ltd.

Heat Pump : 6 kW / unit x 2 x 12 run time x 4 Baht /unit = 576Baht/day = 17,280Baht/month =207,360Baht /year.

Electric Heater: 70 kW x 6run time  x 4 Baht             =      1,680Baht/day =50,400Baht/month =604,800Baht/year.

So can save much as 397,440 Baht per year and 2.5 year pay back period.

DSCN3325

DSCN3326 DSCN3328 DSCN3329 DSCN3330 DSCN3332

เอสจีอีฮีตปั้มสายพันธ์ไทย ดีไซน์ โดยวิศวกรผู้เชี่ยวชาญมากประสบการณ์

  1. siamgreenengineer

    SGE Heat Pump installation at Beyond Kribi the south of Thailand with SGE Heat Pump Model 25 x 2 units flow hot water at 60 oC for guest room.

ใส่ความเห็น

This site uses Akismet to reduce spam. Learn how your comment data is processed.