SGE Heat Pump@Samui Buri Resort

SGE Heat Pump install at Samui Buri Resort which energy saving project ever use heat pump and now.

change the new one the system supply to resort and building
The energy cost only 2 units side model 25  with energy cost 12kW hour and run 12 hour per day.

compare :

SGE Heat Pump 6kW x 2            = 12kW   per hour.

Electric Heater 4kW x 90 units    = 360kW per hour.

so 12kW x 12hour x 4 Baht /unit = 576 Baht per day      = 17,280 per month.

and 4kW x 90 units x 1.3hr x 4    = 1,872 per day which = 56,160 per month.

save 38,880 Baht per month  and 466,560 per year .

so only 1 year pay back period .

Finished installation heat pump.

Main idea Samui Buri first use electric heater according to above but very expensive bill when

change be SGE Heat Pump it can pay back only 1 and half year.which we are change indevidual

electric heater and make new pipe main line to guest room resort and building .

Important : When you so lately install heat pump you will loss benefit .

เหตุผลที่ทำให้โรงเเรมสมุยบุรีตัดสินใจที่จะใช้ Heat Pump.

  1. ประหยัดเงินค่าไฟฟ้าลง50%
  2. ได้ลมเย็นมาใช้จากผลพลอยได้ 10 ตันความเย็น/ชม.
  3. มีความปลอดภัยสูดกว่า บอยล์เลอร์ เพราะไม่เกิดการระเบิด
  4. บำรุงรักษาง่ายเหมือนเเอร์
  5. ใช้พื้นที่น้อยในการติดตั้ง

 

Start installation SGE Heat Pump.

Connect piping  PPR PN20 to SGE Heat Pump.

Next will shoot cool air to other room with 24 Centigrate.

Checking line pipe to connect return pump and supply pipe.

SGE team and hotel team coopreate move SGE heat Pump to base site.

 

ThanksThe Owner for trust our SGE Heat Pump .